Rebuild the delivered application before calling the handover complete
A successor can have the source code and still be unable to reproduce the application that was reviewed. Dependencies, runtime versions, build settings and private package access can change the result. A useful handover tests the documented procedure in a clean, authorised environment rather than relying on the original developer's working folder.
The following fictional rehearsal concerns a supplier's catalogue application. Its purpose is to distinguish a dependable delivery reference from an unreviewed dependency upgrade.
Find the difference between the instructions and the delivery
The delivery record identifies source revision C-18 and its dependency lockfile. The handover note, however, tells the next maintainer to install the latest packages before building. The successor follows that instruction and obtains a different dependency set. A catalogue comparison that worked in the reviewed build now behaves differently.
The inspection establishes that the source revision is correct, but the new installation has changed a dependency beyond the recorded delivery set. The immediate finding is a reproducibility gap in the instructions. It does not prove that the newer package is defective or that the application should never be updated.
The first task is to recover the known review basis. A dependency upgrade can then be assessed as a separate change with its own evidence.
Document the installation the project actually uses
For an npm-based project, the official npm ci documentation explains its clean-install use, requirement for a lockfile and refusal to update inconsistent manifest and lockfile data. It also notes that relevant installation flags must match those used to create the lockfile. The command alone is not a guarantee that the entire build will be identical.
The revised handover records the source revision, runtime and package-manager versions, lockfile, project configuration, build command and required environment-variable names. Secrets are supplied through the authorised process, not written into the public instructions. Build-time inputs and external assets that can affect the output are identified as well.
A clean installation uses the recorded dependency basis. It does not silently repair a mismatch by rewriting the lockfile, nor replace an unavailable package with a conveniently named alternative.
Complete the rehearsal with the successor
In exercise H-4, the successor starts from C-18 in a clean private environment. The documented runtime and frozen dependency installation complete successfully. The manifest and lockfile remain unchanged. The build finishes, and the reviewed catalogue task can be performed with the same fixture: compare two products and open the specification attached to each one.
The reviewer records that the task outcome matches the agreed delivery example. This is functional evidence for that environment. It is not a claim of byte-for-byte identical output unless such a comparison has actually been specified and performed.
A second rehearsal removes access to one required private dependency. Installation stops. The revised instructions identify the account owner and restoration process; the successor does not substitute a public package or upgrade the application to bypass the failure. The original delivery record remains intact while access is resolved.
Keep reproducibility separate from maintenance
Pinning the reviewed dependency set provides a reference point. It does not establish that the set remains secure or supported indefinitely. Updates still need assessment, relevant testing and a new recorded delivery basis.
The handover should explain who monitors dependencies and how a change is approved. A future maintainer must be able to tell whether they are reproducing the current release, investigating a defect or preparing an upgrade. Mixing those tasks makes comparisons unreliable.
Check the operational information alongside the build
The organisation also needs ownership of the appropriate repositories, hosting and provider accounts; a documented release and recovery process; and a safe way to obtain configuration. Include the scope of backups and the restrictions of the private environment. A successful build should never trigger real customer messages merely because production endpoints were copied into configuration.
The final handover record names the person who completed H-4, the instructions used, the outcome and the remaining limits. That is more useful than a list of files marked received. The support service can assess takeover and maintenance needs, while the process page explains how those responsibilities are agreed before delivery.